SECONDARY SCHOOL OF SARATAK

Capacity

30,34 kW

Location

SECONDARY SCHOOL OF SARATAK

Solar modules

SOLET 410MH5-54 74 pcs

Inverter

Solax X3-PRO-30K-G2 1 pcs 30 kW

Annual electricity production

45510 kWh

MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW
"GAVA" LLC, Aragatsotn province, Ashtarak 28.5 kW
"GAVA" LLC, Aragatsotn province, Ashtarak
28.5 kW
Zar secondary school named after J.Sargsyan 75,85 kW
Zar secondary school named after J.Sargsyan
75,85 kW
Ararat province, Sayat Nova village 9.36 կՎտ
Ararat province, Sayat Nova village
9.36 կՎտ