SECONDARY SCHOOL OF SARATAK

Capacity

30,34 kW

Location

SECONDARY SCHOOL OF SARATAK

Solar modules

SOLET 410MH5-54 74 pcs

Inverter

Solax X3-PRO-30K-G2 1 pcs 30 kW

Annual electricity production

45510 kWh

"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Gyumri Basic School No. 6 25,83 kW
Gyumri Basic School No. 6
25,83 kW
"Ararat" restaurant, Syunik province, c. Kapan 99.96 kW
"Ararat" restaurant, Syunik province, c. Kapan
99.96 kW
LUSAGHBYUR SECONDARY SCHOOL 20,09 kW
LUSAGHBYUR SECONDARY SCHOOL
20,09 kW