School, Syunik province, Agarak

Capacity:

22.44 kW

Location:

Marz Syunik

Solar modules:

AE SOLAR 330 W, monocrystalline 68 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 20000 TL, Germany

Annual electricity production։

33660 kWh

Type:

On-grid, three-phase

"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW
"FATHER & SON KHUBLARYANS" LLC, Yerevan, Ayvazovski str. 28.5 kW
"FATHER & SON KHUBLARYANS" LLC, Yerevan, Ayvazovski str.
28.5 kW
Kaputan secondary school 23,37 kW
Kaputan secondary school
23,37 kW