Guest House, Vayoc Dzor, Elpin village

Capacity:

53.82 kW

Location:

Vayoc Dzor, Elpin

Solar modules:

RECOM 345 W, monocrystalline 156 pcs, Germany

Inverter:

SMA Sunny Tripower CORE1, Germany

Annual electricity production։

80730 kWh

Type:

On-grid, three-phase

"Sam" LLC, Syunik province, Sisian 9․52 kW
"Sam" LLC, Syunik province, Sisian
9․52 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Kotayk province, v. Qasakh 10.35 kW
Kotayk province, v. Qasakh
09 Sep 2018
10.35 kW
MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW