VI-EL-VI company, salon Shiraz

 

Kotayk Secondary School After S.Vardanyan 30,75 kW
Kotayk Secondary School After S.Vardanyan
30,75 kW
MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW
Kotayk province, Abovyan 4.83 kW
Kotayk province, Abovyan
18 Mart 2019
4.83 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str. 30.36 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str.
15 August 2017
30.36 kW