Yerevan, Nork-Marash administrative district

Capacity

31.92 kW

Location

Yerevan, Nork-Marash administrative district

Solar modules

,AE SOLAR 380 W, monocrystalline 84 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

47880 kWh

SECONDARY SCHOOL NAMED AFTER HENRIK ABRAHAMYAN 9,84 kW
SECONDARY SCHOOL NAMED AFTER HENRIK ABRAHAMYAN
9,84 kW
Lori province, Vanadzor 5.52 kW
Lori province, Vanadzor
18 July 2018
5.52 kW
Sewing workshop, Yerevan, Nubarashen a.d. 41․87 kW
Sewing workshop, Yerevan, Nubarashen a.d.
15 Jule 2018
41․87 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW