Yerevan, Noy district

Capacity:

9.9 kW

Location:

Yerevan, Noy district

Solar modules:

AE SOLAR 330 W, monocrystalline 30 pcs, Germany

Inverter:

SMA Sunny Tripower 10000 TL, Germany

Annual electricity production։

15000 kWh

Type:

On-grid, three-phase

VI-EL-VI company, salon Shiraz 220,5 kWt
VI-EL-VI company, salon Shiraz
An innovative project equipped with the German SMA ShadeFix shade management system will produce more electricity than standard plants.
220,5 kWt
"G.Solar" LLC, Aragacotn Province, Karmrashen village 800 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village
The installation of 800 kW power plant was made with 14 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
01 July 2020
800 kW
Syunik province, Agarak 10.2 kW
Syunik province, Agarak
05 Nov 2019
10.2 kW
"Sam" LLC, Syunik province, Sisian 9․52 kW
"Sam" LLC, Syunik province, Sisian
9․52 kW