Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi

Capacity

6,38 kW

Location

Nor Kharberd Secondary School N 1 named after Hovhannes Tlkatintsi

Solar modules

SOLET 410MH5-54 28 pcs

Inverter

Solax X3-10K-TL 1 pcs 10 kW

Annual electricity production

9570 MWh

"HAMOVIK" LLC, Yerevan, Malatia-Sebastia administrative district 52.82 kW
"HAMOVIK" LLC, Yerevan, Malatia-Sebastia administrative district
52.82 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW
Aragatsotn province, v. Parpi 5.28 kW
Aragatsotn province, v. Parpi
25 June 2019
5.28 kW
Yerevan, Davtashen 12․81 kW
Yerevan, Davtashen
05 May 2018
12․81 kW