Lori province, Vanadzor

Capacity:

5.52 kW

Location:

Marz Lori, Vanadzor

Solar modules:

AE SOLAR 345 W, monocrystalline 16 pcs, Germany

Inverter:

KACO Blueplanet 5.0 TL3, Germany

Annual electricity production։

7700 kWh

Type:

On-grid, three-phase

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Machine-tool workshop, Yerevan, Malatia-Sebastia administrative district 11.7 kW
Machine-tool workshop, Yerevan, Malatia-Sebastia administrative district
11.7 kW
Georgia, Tbilisi 6․12 kW
Georgia, Tbilisi
6․12 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district 42.78 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district
15 January 2019
42.78 kW