"GAVA" LLC, Aragatsotn province, Ashtarak

Capacity

28.5 kW

Location

Aragatsotn province, Ashtarak

Solar modules

,AE SOLAR 380 W, monocrystalline 75 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

42380 kWh

Aragatsotn province, v. Ushi 5.28 kW
Aragatsotn province, v. Ushi
20 July 2019
5.28 kW
Vacation house belonging to the Central Bank of the Republic of Armenia 57,75 kW
Vacation house belonging to the Central Bank of the Republic of Armenia
57,75 kW
"GaGor" LLC, Aragatsotn province, Ashtarak 132.21 kW
"GaGor" LLC, Aragatsotn province, Ashtarak
132.21 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW