"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

SECONDARY SCHOOL OF SARATAK 30,34 kW
SECONDARY SCHOOL OF SARATAK
30,34 kW
"Viar" smithy, Kotayk province, Yeghvard 15.2 kW
"Viar" smithy, Kotayk province, Yeghvard
15.2 kW
Yerevan, Nork-Marash administrative district 23.56 kW
Yerevan, Nork-Marash administrative district
23.56 kW
Arga Commercial and industrial equipment factory in Aramus 54,54 kWt
Arga Commercial and industrial equipment factory in Aramus
"Ohm Energy" solar plant at "ARGA" industrial equipment factory (Aramus village)
54,54 kWt