"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

Yerevan, Vahagni district 15.96 kW
Yerevan, Vahagni district
15.96 kW
Yerevan, Nor Nork 10.2 kW
Yerevan, Nor Nork
10.2 kW
"HAMOVIK" LLC, Yerevan, Malatia-Sebastia administrative district 52.82 kW
"HAMOVIK" LLC, Yerevan, Malatia-Sebastia administrative district
52.82 kW
Aragatsotn province, v. Ushi 5.28 kW
Aragatsotn province, v. Ushi
20 July 2019
5.28 kW