"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW
Yerevan, Ajapnyak 6.12 kW
Yerevan, Ajapnyak
15 October 2019
6.12 kW
Kotayk province, Yeghvard 5.44 kW
Kotayk province, Yeghvard
5.44 kW
"Roma" LLC, Yerevan, Avan administrative district 18 kW
"Roma" LLC, Yerevan, Avan administrative district
18 kW