"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

Martuni N2 basic school after S. Darbinyan 37,72 kW
Martuni N2 basic school after S. Darbinyan
37,72 kW
Yerevan, Nork-Marash administrative district 31.92 kW
Yerevan, Nork-Marash administrative district
31.92 kW
Kotayk province, Abovyan 4.83 kW
Kotayk province, Abovyan
18 Mart 2019
4.83 kW
"FATHER & SON KHUBLARYANS" LLC, Yerevan, Ayvazovski str. 28.5 kW
"FATHER & SON KHUBLARYANS" LLC, Yerevan, Ayvazovski str.
28.5 kW