"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi

Capacity

586․17 kW

Location

Kotayk province, v. Nor Geghi

Solar modules

AE SOLAR 390 W, monocrystalline 1503 pcs, Germany

Inverter

5 pieces of Huawei 100 kW inverters

Annual electricity production

879255 kWh

Reduction of CO2 emissions

395 tons / year

Description

 

The installation of  587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.

 

 

Salon for car window tinting, Yerevan, Sheram street 10.64 kW
Salon for car window tinting, Yerevan, Sheram street
10.64 kW
Sewing workshop, Yerevan, Nubarashen a.d. 41․87 kW
Sewing workshop, Yerevan, Nubarashen a.d.
15 Jule 2018
41․87 kW
Zar secondary school named after J.Sargsyan 75,85 kW
Zar secondary school named after J.Sargsyan
75,85 kW
Hatis Secondary school after V. Vardanyan SNCO 20,5kW
Hatis Secondary school after V. Vardanyan SNCO
20,5kW