"Roma" LLC, Yerevan, Avan administrative district

Capacity

18 kW

Location

Yerevan, Avan administrative district

Solar modules

,AE SOLAR 450 W, monocrystalline 40 pcs, Germany

Inverter

SMA STP 15000TL-30, Germany

Annual electricity production

27000 kWh

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Machine-tool workshop, Yerevan, Malatia-Sebastia administrative district 11.7 kW
Machine-tool workshop, Yerevan, Malatia-Sebastia administrative district
11.7 kW
Salon for car window tinting, Yerevan, Sheram street 10.64 kW
Salon for car window tinting, Yerevan, Sheram street
10.64 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str. 30.36 kW
Electrical equipment repair manufacturing workshop, Yerevan, Babayan str.
15 August 2017