Kotayk province, Yeghvard

Capacity

5.44 kW

Location

Kotayk province, Yeghvard

Solar modules

,AE SOLAR 340 W, monocrystalline 16 pcs, Germany

Inverter

SMA SUNNY BOY, Germany

Annual electricity production

8160 kWh

CHILDREN'S ART SCHOOL OF THE MARTUNI 16,4 kW
CHILDREN'S ART SCHOOL OF THE MARTUNI
16,4 kW
"GAVA" LLC, Aragatsotn province, Ashtarak 28.5 kW
"GAVA" LLC, Aragatsotn province, Ashtarak
28.5 kW
Production of sanitary products, Shirak province, Gyumri 20.52 kW
Production of sanitary products, Shirak province, Gyumri
20.52 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW