Aragatsotn province, v. Ushi

Capacity:

5.28 kW

Location:

Marz Aragatsotn, v. Ushi

Solar modules:

AE SOLAR 330 W, monocrystalline 16 pcs, Germany

Inverter:

SMA SUNNY BOY 5.0, Germany

Annual electricity production։

7920 kWh

Type:

On-grid, single-phase

CHILDREN'S ART SCHOOL OF THE MARTUNI 16,4 kW
CHILDREN'S ART SCHOOL OF THE MARTUNI
16,4 kW
"Bonilat" LLC, Yerevan, Myasnikyan Ave. 99.36 kW
"Bonilat" LLC, Yerevan, Myasnikyan Ave.
12 July 2019
99.36 kW
Lori province, Vanadzor 5.52 kW
Lori province, Vanadzor
18 July 2018
5.52 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW