Production of sanitary products, Shirak province, Gyumri

Capacity:

20.52 kW

Location:

Marz Shirak, Gyumri

Solar modules:

AE SOLAR 380 W, monocrystalline 54 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 20000 TL, Germany

Annual electricity production։

30780 MWh

Type:

On-grid, three-phase

"Module Sun" LLC, Gegharkunik Province, Mets Masrik village 3500 kW
"Module Sun" LLC, Gegharkunik Province, Mets Masrik village
The installation of the solar station was carried out with bifacial solar panels. 14 Huawei solar inverters with a capacity of 215 kW were used.
3500 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW
Kotayk province, Abovyan 4.83 kW
Kotayk province, Abovyan
18 Mart 2019
4.83 kW
Arga Commercial and industrial equipment factory in Aramus 54,54 kWt
Arga Commercial and industrial equipment factory in Aramus
"Ohm Energy" solar plant at "ARGA" industrial equipment factory (Aramus village)