"EDMET" LLC, Yerevan, Shengavit administrative district

Capacity:

114 kW

Location:

Yerevan

Solar modules:

AE SOLAR 380 W, monocrystalline 300 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER CORE1 STP 50-40, 2 pcs, Germany

Annual electricity production։

171000 kWh

Type:

On-grid, three-phase

"Artsakh" hotel, Yerevan, Shengavit administrative district 42.78 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district
15 January 2019
42.78 kW
Ani Resort" Hankavan, Kotayk province πŸπŸ‘πŸŽβ€€πŸ— kWt
Ani Resort" Hankavan, Kotayk province
This innovative solar plant installed to save nature and save electricity costs
πŸπŸ‘πŸŽβ€€πŸ— kWt
Yerevan, Ajapnyak 6.12 kW
Yerevan, Ajapnyak
15 October 2019
6.12 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW