Sewing workshop, Yerevan, Nubarashen a.d.

Capacity:

41․87 kW

Location:
Yerevan, Nubarashen a.d.
Solar modules:

AE SOLAR 345 W, monocrystalline 78 pcs,AE SOLAR 340 W, monocrystalline 44 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 15000 TL, SMA SUNNY TRIPOWER 25000 TL, Germany

Annual electricity production։

62805 kWh

Type:

On-grid, three-phase

Sevaberd secondary School 10.66 kW
Sevaberd secondary School
10.66 kW
Kotayk province, v. Qasakh 5.32 kW
Kotayk province, v. Qasakh
5.32 kW
MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW
SECONDARY SCHOOL NAMED AFTER HENRIK ABRAHAMYAN 9,84 kW
SECONDARY SCHOOL NAMED AFTER HENRIK ABRAHAMYAN
9,84 kW