Sewing workshop, Yerevan, Nubarashen a.d.

Capacity:

41․87 kW

Location:
Yerevan, Nubarashen a.d.
Solar modules:

AE SOLAR 345 W, monocrystalline 78 pcs,AE SOLAR 340 W, monocrystalline 44 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 15000 TL, SMA SUNNY TRIPOWER 25000 TL, Germany

Annual electricity production։

62805 kWh

Type:

On-grid, three-phase

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
Salon for car window tinting, Yerevan, Sheram street 10.64 kW
Salon for car window tinting, Yerevan, Sheram street
10.64 kW
Gyumri Basic School No. 6 25,83 kW
Gyumri Basic School No. 6
25,83 kW
"MG" Supermarket, Yerevan, Bagratunyats St. 100.32 kW
"MG" Supermarket, Yerevan, Bagratunyats St.
100.32 kW