Sewing workshop, Yerevan, Nubarashen a.d.

Capacity:

41․87 kW

Location:
Yerevan, Nubarashen a.d.
Solar modules:

AE SOLAR 345 W, monocrystalline 78 pcs,AE SOLAR 340 W, monocrystalline 44 pcs, Germany

Inverter:

SMA SUNNY TRIPOWER 15000 TL, SMA SUNNY TRIPOWER 25000 TL, Germany

Annual electricity production։

62805 kWh

Type:

On-grid, three-phase

CHILDREN'S ART SCHOOL OF THE MARTUNI 16,4 kW
CHILDREN'S ART SCHOOL OF THE MARTUNI
16,4 kW
Armavir province, Armavir 9.9 kW
Armavir province, Armavir
05 June 2019
9.9 kW
SECONDARY SCHOOL OF SARATAK 30,34 kW
SECONDARY SCHOOL OF SARATAK
30,34 kW
Kotayk province, v. Ara 5.28 kW
Kotayk province, v. Ara
5.28 kW