Armavir province, v. Parakar

Capacity:

5.28 kW

Location:

Marz Armavir, v. Parakar

Solar modules:

AE SOLAR 330 W, monocrystalline 16 pcs, Germany

Inverter:

SMA SUNNY BOY 5.0, Germany

Annual electricity production։

8184 kWh

Type:

On-grid, single-phase

Yerevan, Nork-Marash administrative district 23.56 kW
Yerevan, Nork-Marash administrative district
23.56 kW
Aragatsotn province, v. Ushi 5.28 kW
Aragatsotn province, v. Ushi
20 July 2019
5.28 kW
Salon for car window tinting, Yerevan, Sheram street 10.64 kW
Salon for car window tinting, Yerevan, Sheram street
10.64 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village 3000 kW
"Sun Energy" LLC, Armavir Province, Merdzavan village
The installation of 3 MW power plant was made with 60 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits. The generated capacity is transferred to the "Spandaryan" substation.
04 Dec 2020
3000 kW