Kotayk province, v. Qasakh

Capacity:

10.35 kW

Location:

Marz Kotayk, v. Qasakh

Solar modules:

RECOM 345 W, monocrystalline 30 pcs, Germany

Inverter:

KACO Blueplanet 10.0 TL3, Germany

Annual electricity production։

15525 kWh

Type:

On-grid, three-phase

MOUSSALER PRINTING HOUSE 510 kW
MOUSSALER PRINTING HOUSE
The installation of 510 kWt power plant was made more than 1300 solar panels. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures
510 kW
Dilijan Central School 182,6 kW
Dilijan Central School
🏦 𝟐𝟎𝟐𝟑 թվականին Կենտրոնական բանկի կողմից հայտարարված մրցույթում հաղթող է ճանաչվել «Օհմ Էներջի» ընկերությունը։
182,6 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village 800 kW
"G.Solar" LLC, Aragacotn Province, Karmrashen village
The installation of 800 kW power plant was made with 14 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
01 July 2020
800 kW
TSOVAGYUGH SECONDARY SCHOOL NAMED AFTER MURATSAN SNPO 31,16 կՎտ
TSOVAGYUGH SECONDARY SCHOOL NAMED AFTER MURATSAN SNPO
31,16 կՎտ