Yerevan, Haghtanak lane

Capacity

5․85 kW

Location

Yerevan, Haghtanak lane

Solar modules

AE SOLAR 390 W, monocrystalline 15pcs, Germany

Inverter

SMA Sunny Tripower 5․0 Germany

Annual electricity production

8775 kWh

"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district 42.78 kW
"Artsakh" hotel, Yerevan, Shengavit administrative district
15 January 2019
42.78 kW
Kotayk province, v. Qasakh 10.35 kW
Kotayk province, v. Qasakh
09 Sep 2018
10.35 kW
"PrintMan" Printing house, Shirak province, Gyumri 11.4 kW
"PrintMan" Printing house, Shirak province, Gyumri
11.4 kW