Yerevan, Haghtanak lane

Capacity

5․85 kW

Location

Yerevan, Haghtanak lane

Solar modules

AE SOLAR 390 W, monocrystalline 15pcs, Germany

Inverter

SMA Sunny Tripower 5․0 Germany

Annual electricity production

8775 kWh

"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48 28.5kW
"ELITE 1" LLC, Yerevan, Nerqin Charbakh 48
28.5kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village 5000 kW
"Solar Farm" LLC, Gegharkunik Province, Shoghakat village
The installation of 6 MW pick power (5 MW nominal power ) plant was made with 100 blocks (inverters). The Power plant is equipped with accident-prevention systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
07 Nov 2020
5000 kW
"Module Sun" LLC, Gegharkunik Province, Mets Masrik village 3500 kW
"Module Sun" LLC, Gegharkunik Province, Mets Masrik village
The installation of the solar station was carried out with bifacial solar panels. 14 Huawei solar inverters with a capacity of 215 kW were used.
3500 kW
ARPI KINDERGARTEN 6,56 kW
ARPI KINDERGARTEN
Բարեգործական ծրագրի շրջանակում ամեն տարի մի քանի տասնյակ կրթական հաստատություններ անցում են կատարում արևային էներգիային։
6,56 kW