Machine-tool workshop, Yerevan, Malatia-Sebastia administrative district

Capacity

11.7 kW

Location

Yerevan, Shengavit administrative district

Solar modules

AE SOLAR 390 W, monocrystalline 30 pcs, Germany

Inverter

SMA SUNNY TRIPOWER, Germany

Annual electricity production

17316 kWh

Kotayk province, Abovyan 4.83 kW
Kotayk province, Abovyan
18 Mart 2019
4.83 kW
"Agarak Terminal" LLC, Syunik province, Agarak 54.72 kW
"Agarak Terminal" LLC, Syunik province, Agarak
54.72 kW
Kotayk province, v. Arinj 6.9 kW
Kotayk province, v. Arinj
14 March 2018
6.9 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi 587 kW
"Lusakerti Elit" LLC, Kotayk province, v. Nor Geghi
The installation of 587 kWt power plant was made with 5 inverters. The Power plant is equipped with accident-prevention  systems to avoid short circuit, non-sinusoidal currents, overvoltages, abrupt voltage changes, zero wire breakage problems, and other failures. In the surrounding area was installed an earth ground loop with a resistance less than 4 ohms for AC and DC circuits.
587 kW